Green Globe, LLC

Green Globe, LLCGreen Globe, LLCGreen Globe, LLC

Green Globe, LLC

Green Globe, LLCGreen Globe, LLCGreen Globe, LLC
  • Home
  • Contact Us
  • Subsidiaries
  • More
    • Home
    • Contact Us
    • Subsidiaries
  • Home
  • Contact Us
  • Subsidiaries

Welcome to Green Globe, LLC

Welcome to Green Globe, LLCWelcome to Green Globe, LLCWelcome to Green Globe, LLC

Providing Solutions for Your Environmental Needs

Contact us

31 Years of treatment across the world

Fixed Plant Thermal Treatment

Two Thermal Plants Treating Dioxane in Australia

On-Site Thermal Treatment Budapest, Hungary

We design, engineer, build and rebuild plants. Over 30 Years experience meeting or beating construction timetables. After construction we will staff the unit or supply onsite instructors until your operators and personnel are trained. 

On-Site Thermal Treatment Budapest, Hungary

Two Thermal Plants Treating Dioxane in Australia

On-Site Thermal Treatment Budapest, Hungary

Onsite Plant Construction and Processing Throughout Europe. Our transportable plant is designed to treat 50 MT/hr of aliphatic and aromatic hydrocarbons (including, PFAS, PCB's, and Dioxanes)

Two Thermal Plants Treating Dioxane in Australia

Two Thermal Plants Treating Dioxane in Australia

Two Thermal Plants Treating Dioxane in Australia

 We were hired to redesign and operate two onsite LTTD dioxane treatment plants that were unable to meet their permit-required emission standards. We completed the redesign and construction ahead of schedule and met both the air emission and residential treatment stands on the soil. 

Onsite hazardous waste treatment

Onsite Hazardous Waste Stabilization/Solidification

Onsite Hazardous Waste Stabilization/Solidification

Onsite Hazardous Waste Stabilization/Solidification

Our One-of-a-Kind Treatments Convert hazardous waste to nonhazardous. Our crews can perform the entire cleanup, from excavation to treatment, or we can subcontract a portion of the work from existing contractors.

Dredge Material

Onsite Hazardous Waste Stabilization/Solidification

Onsite Hazardous Waste Stabilization/Solidification

 

Our onsite permit enables us to provide the exact size treatment unit required by the client. Treatment capacity of up to 500 tons per hour. We are New England's only permitted pugmill and/or inline mobile facility.

Change your Hazardous Waste into a Product

Onsite Hazardous Waste Stabilization/Solidification

Change your Hazardous Waste into a Product

 

Our permitted procedure 

allow us to treat hazardous waste and convert it into a usable product. 

The finished product in this case is a roller compacted concrete driveway.

Landfill closure

Green Globe has over 30 years experience in providing landfill closure assistance.

Are you looking at a costly landfill closure? Contact us today.  We can assist you in creating a  low/no cost closure .

Copyright © 2024 Green Globe, LLC - All Rights Reserved.

Powered by GoDaddy

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept